To assure uninterrupted electric power supply during matches and training sessions, the genset is always fired up in advance and synchronised with the distribution network. Electric power supply from the genset and the power grid is divided 50/50. This means that in the event of power failure during a match (or training session), no power disruptions occur. When power supply from the power grid is restored, InteliGen NT automatically synchronises the genset back with the grid and the 50/50 use ratio of the two sources is reactivated. At the end of the match, the genset is unloaded and turned off. Between matches, the system stays in the stand-by mode, ready to be used in the instance of a power grid failure