The site was monitored to collect detailed data on the site load profiles (daily and seasonal) and genset operating sequences. A 725 kWp PV system was then designed and installed, comprising of 1,908 380W Jinko Solar modules and 12 SMA STP 60 inverters.
The diesel generating sets were equipped with InteliGen NTC BaseBox load sharing controllers, which have been also enabled for Dynamic Spinning Reserve (DSR) feature. This allows the plant operation to consider the possibility of sudden PV output drop due to intermittent solar irradiation.