Phase one was completed within 13 days without single interruption of the power supply and established a solid base for phase two.
The objective of phase two was to ensure smooth operation of the gen-sets along the wind turbines offering the option of curtailing the wind turbine output in high wind speed occurrence, and lay groundword for the sites future extension by adding photovoltaic panels.